Beranda » Model » All New GR 86

All New GR 86

Preview
Yusar
Sales Consultant
Video
Deskripsi

Beyond Exterior

With A More Stylish and Sporty Design Concept

Prominent Front Bumper Spoiler & Grille

Prominent Front Bumper Spoiler & Grille

The front look features the GR-specific functional MATRIX Grille and Aerodynamic Front Bumper Spoiler with GR Emblem, which fuses performance and emotionality.

Powerful GR Rear Bumper Spoiler

Powerful GR Rear Bumper Spoiler

The formidable rear bumper design creates aggressive touch and aerodynamic performance to own any road.

GR 86 Grade Emblem

GR 86 Grade Emblem

To mark its evolution from the previous generation of 86, the grade emblem is redesigned by combining the classic 86 and Toyota Gazoo Racing logo.

Exquisite LED Headlamp

Exquisite LED Headlamp

Sleek design LED lighting improves visibility and style in every situation.

Black Matte 18" Alloy Wheel

Black Matte 18" Alloy Wheel

The agile performance and handling fueled by the 18-inch black matte sport tires alloy wheel provide a tighter grip on the road.

GR Side Skirt Design

GR Side Skirt Design

Take the sporty attitude in every turn, as the GR finesse design side skirt is crafted elegantly on the side exterior.

Aerodynamic GR Trunk Spoiler

Aerodynamic GR Trunk Spoiler

Aerodynamic profile performed on the rear exterior that comes with racing-inspired GR design.

Beyond Interior

Now comes with a more aggressive appearance and gives the impression of sporty while riding. A most qualified cabin in its class.

Sporty Dashboard

Sporty Dashboard

The GR red and black colors are available to create a racing-excitement feeling as the leather, and ultra suede materials also give driving convenience inside.

Advanced 8" Head Unit with Smartphone Connectivity

Advanced 8" Head Unit with Smartphone Connectivity

A suite of connected services, such as smartphone connectivity, helps you seamlessly stay connected, as the GR logo will welcome you from the start.

Air Purifier

Air Purifier

Pleasant Air Purifier to create immeasurable pleasure in every driving moment.

Premium Speaker

Premium Speaker

Installed with JBL Sound System surrounds the cabin to enrich enjoyment while driving.

Adaptable Transmission

Adaptable Transmission

Choose your thrill: whether you use a 6-speed close-ratio manual or you can also go with 6-speed auto with Dynamic Rev Management.

Digital 7" TFT MID

Digital 7" TFT MID

A fully digital instrument display will convey important information as you can customize the tachometer animation between Normal, Sport and newly Track Mode.

Rear Parking Monitor

Rear Parking Monitor

An advanced camera is attached to the backside of the car to help you with a clear view, especially when parking or reversing.

Beyond Safety

Now with active safety features to ensure you and your passengers maximum safety.

Automatic High Beam (AHB)

Automatic High Beam (AHB)

Detect headlights and taillights of the vehicle in front and gives earlier detection of pedestrians or obstacles, then adjust the lamp and direction automatically when the button is switched on. (A/T and M/T Type)

Adaptive Cruise Control

Adaptive Cruise Control

Detects a preceding vehicle and follow within a safe distance, therefore reducing the fatigue of long driving. *The Cruise Control feature may differ in A/T and M/T type

Pre Collision System (PCS)

Pre Collision System (PCS)

Stereo camera system that helps to reduce crash risk and damage with enhanced recognition to support intersection collision avoidance for turns and vehicle meets head-on. (A/T and M/T Type)

Lane Departure Warning

Lane Departure Warning

Alert when the vehicle is driving at approximately 40km/h or more and the vehicle is likely to depart the lane. (A/T and M/T Type)

Lane Sway Warning

Lane Sway Warning

Alert when the system detects that the vehicle is wandering or drifting within the lane (approximately 60km/h or more). (A/T and M/T Type)

Lane Change Assist (LCA)

Lane Change Assist (LCA)

Help to detect vehicles in the neighboring lanes approaching from the rear at high speed. (A/T and M/T Type)

Rear Cross Traffic Alert (RCTA)

Rear Cross Traffic Alert (RCTA)

Notify you with audible alerts on the inside if there is a potential collision during driving backwards. (A/T Type only)

Lead Vehicle Start Alert

Lead Vehicle Start Alert

Automatically notify you that the vehicle ahead has departed by approximately 3 meters or more through sounds and display. (A/T and M/T Type) *Press the brake early for the M/T Type

Blind Spot Monitor (BSM)

Blind Spot Monitor (BSM)

Uses a system of indicator lights on the side mirrors and audible warnings to alert drivers when a vehicle enters your blind spot. (A/T and M/T Type)

Pre Collision Throttle Management and Reverse Automatic Braking

Pre Collision Throttle Management and Reverse Automatic Braking

System to prevent unintended acceleration by providing a sound sensor notification. (A/T Type only)

Emergency Brake System (EBS)

Emergency Brake System (EBS)

Giving a signal and alerting the driver to maintain a safe distance to avoid collision.

Anti Lock Braking System (ABS), Electronic Braking Distribution (EBD) & Brake Assist (BA)

Anti Lock Braking System (ABS), Electronic Braking Distribution (EBD) & Brake Assist (BA)

Ensure maximum braking safety.

Hill-Start Assist

Hill-Start Assist

Prevents the vehicle from rolling back on steep hills.

Traction Control & Vehicle Stability Control (VSC)

Traction Control & Vehicle Stability Control (VSC)

More control during acceleration and cornering.

Beyond Connected

An integration solution that you can access through mToyota Application. Giving you comfort, providing peace of mind and always get connected to your car.

Find My Car

Find My Car

Accurately know where the vehicle is parked to provide you feeling of safety and convenience.

Geofencing

Geofencing

Giving alert if your vehicle is outside the authorized zone to ensure your security at all times.

Guest Driver Alert

Guest Driver Alert

Enable specific push notification settings (Distance Radius, Max. Speed, and Max. Idle Time) when you permit other driver to use the vehicle (Ex: Valet Parking).

Speed & Idle Alert

Speed & Idle Alert

Get push notification when your vehicle exceeds the defined speed limit & engine idle duration based on your preference.

Time Fencing

Time Fencing

Get push notification when your vehicle is being used (Engine On) during specified time period based on your preference.

E-Care (Maintenance)

E-Care (Maintenance)

A reminder to you for periodic vehicle maintenance to make your vehicle always in the best performance.

Emergency Road Assistance

Emergency Road Assistance

Provide an SOS button if you get in an accident. You will be assisted by the Toyota Call Center to be directed to the Emergency Road Assistance (ERA) provider to make you feel safer while driving.

Inquiry & Support Center

Inquiry & Support Center

Direct assistance from Toyota Call Center to solve your problems. Give you more ability to keep moving forward.

Driving Report

Driving Report

Summarize your driving sessions by daily & monthly report.

Safe Driving Reward

Safe Driving Reward

Drive safely by reducing Harsh Acceleration, Harsh Braking, and Harsh Cornering and get the applicable rewards/benefit* for your next Insurance Policy** renewal. *Benefit may varies and given from your insurance provider. **Please contact your newest dealer for more detail.

Beyond Accessories

Customization items may vary depending on the products and areas.

GR Interior Panel Set

GR Interior Panel Set

A carbon-like design will bring a sportier feeling to the car's interior. The set covers the dashboard, center console, and power window switch panels.

GR Aero Stabilizing Cover

GR Aero Stabilizing Cover

Fill the step between the rear glass and the trunk lid and rectifies the air flowing to the trunk.

GR Sunshade

GR Sunshade

GR exclusive design sunshade specifically made for GR86 to protect the interior from heat and direct sunlight.

GR Knee Pad

GR Knee Pad

Supports your driving posture to help you stay stable during your everyday drive.

GR Sport Side Visor

GR Sport Side Visor

Aerodynamic design that leads the airflow perfectly and enhances steering stability.

GR Sport Muffler

GR Sport Muffler

Developed to amplify the engine sound to make driving more fun and improve the car's stylish attitude.

 

Bagikan ke
Ditayangkan: 1 March 2026 |

Harga All New GR 86

Toyota GR 86 Medan
Inden
1 type available
TypeHarga
GR 86 2.4L M/TRp 1.113.800.000
*harga dapat berubah sewaktu-waktu
Kami juga menyediakan alat simulasi kredit agar Anda bisa merencanakan kredit kendaraan Anda bersama kami.
Model Lain
Toyota GR Supra Medan

New GR Supra

Harga mulai
Rp 2.4M
Inden
1 type available
Hilux Double Cabin Medan

New Hilux D Cab

Harga mulai
Rp 473.6JT
Best Seller
3 type available
Toyota Agya| Toyota Medan

New Agya

Harga mulai
Rp 204.5JT
Best Seller
3 type available
Toyota Medan

New Raize G

Harga mulai
Rp 264.9JT
Best Seller
4 type available
Toyota Veloz Hybrid | Toyota Medan

New Veloz Hybrid EV

Harga mulai
Rp 305JT
Best Seller
6 type available
Toyota Medan

All New Avanza

Harga mulai
Rp 272.4JT
Best Seller
4 type available
0019444
Visit Today : 27
Visit Yesterday : 70
This Month : 1379
This Year : 18444
Total Visit : 19444
Hits Today : 43
Total Hits : 40096
Who's Online : 9
Your IP Address: 23.27.236.253
Yusar
Sales Consultant
Ingin punya Toyota baru dengan harga terbaik? 🚗 Dapatkan promo Toyota terbaru, diskon menarik, DP ringan, dan cicilan terjangkau. Chat sekarang untuk cek promo dan simulasi kredit Toyota Anda.